Skip to main content
Regulation5 min read

18/09 edition: a support promise needs a maintenance chain

How can you show that a sold release will keep receiving a security response? CRA preparation connects expected use, components and update delivery.

Updated
Recovered day
2026-09-18
Actual publication
2026-10-05
Author
Redação Velqory
Reviewed
05/10/2026 · Europe/Lisbon
Nature
Retrospective analysis published on 5 October; it does not represent original publication on the recovered date.
Operational proposals
Original, untested Velqory recommendations; hypothetical scenarios, with no claimed internal experience or results.
Review condition
Review changes to expected use, dependencies, update channels and legal text; obtain legal review of qualifications.
Technician works inside a handheld terminal with spare parts and a second unit on the workbench.
Technician works inside a handheld terminal with spare parts and a second unit on the workbench. Generated conceptual scene; not documentation of an actual event, product or test.AI-generated image under Velqory editorial direction.

In brief

Planning for general application in December 2027: distinguish the support period from availability of updates already issued.

  • Justify support through expected use, without treating five years as a universal answer.
  • Separate future maintenance from retaining issued updates.
  • Assign an owner to each dependency that could interrupt remediation.

Preparation, not an accelerated duty

This recovered edition asks whether the product owner can support a maintenance promise with an executable chain. It addresses manufacturers, engineering and technical procurement. It is preparatory analysis published in October, not an announcement of a new support duty arising on 18 September.

Article 71 distinguishes general application on 11 December 2027 from Article 14 application on 11 September 2026. The support requirements discussed here must not be presented as a general mandate already applicable in September. Velqory's proposed early preparation is an operational choice, not a changed legal date.

Support and availability are different clocks

Article 13 links the support period to expected use; it establishes at least five years unless expected use is shorter, in which case the period corresponds to that expected use. It also requires security updates issued during support to remain available for at least ten years after issuance or the remaining support period, whichever is longer.

Velqory proposal: keep two independent fields in the release record. The first explains how long security maintenance exists; the second tracks availability of each issued update. Keeping a package in an archive does not, by itself, show that new fixes will continue to be produced.

A dependency can interrupt the promise

Annex I, Part II includes identifying and documenting vulnerabilities and components, with a machine-readable SBOM covering at least top-level dependencies. Do not turn that minimum into a claim that the text requires all transitive dependencies. Article 13 also provides for due diligence on third-party components.

NCSC recommends identifying obsolete products and understanding versions and owners. As a proposed adaptation, ask each component maintainer for version policy, advisory channels and an alternative if support ends before the product's support does. An open licence does not guarantee that a team will be available to fix issues.

A tabletop exercise for the sold release

This original, untested matrix does not certify compliance. The proposed exercise uses a hypothetical release still being distributed, with a dependency approaching end of support. Procurement should not accept continuity solely from a commercial statement; engineering must show what response it could prepare.

Maintenance chain: evidence and acceptance

Proposed operational criteria, not observed execution.

StepOwnerEvidencePass / fail
Define periodProductExpected use and justificationReasoned / five years copied without analysis.
End-of-support dependencyEngineeringReplacement or maintenance planOwner and resources / hope for an external patch.
Deliver fixProduct operationsChannel and authorised procedureTarget release identified / package without destination.
Retain updateRelease managementIndex and artefact accessOwn period tracked / confused with support.

The channel only fixes the newest release

Hypothetical scenario: the team prepares an update for the newest release, but customers on an older release remain within its declared period. Ask who knows those recipients and what compatible update path exists. No invented CVE is needed to expose the delivery gap.

Velqory proposes retaining a controlled demonstration of target-release selection, package validation and incompatibility communication. If the answer is 'the customer should have migrated', request the basis of the original promise before closing. Creating a fix and making a fix usable are different outcomes.

Turn the promise into a product decision

The Commission guidance page lists support periods and risk assessment among preparation topics and stresses its non-binding nature. The obligation comes from the regulation; this article's matrix and exercise are Velqory proposals, with no demonstrated results.

The useful outcome is deciding whether the promise is sustainable, needs resources or requires a legally reviewed commercial strategy change. Retain limitations, dependencies and reassessment conditions. Avoid selling a period simply because the number looks straightforward: the commitment needs someone able to receive, prepare and deliver a security response.

Consulted on the stated update date.

  1. 01Regulamento (UE) 2024/2847 — Cyber Resilience ActUnião Europeia — EUR-Lex · EU-EURLEX
  2. 02Commission publishes new guidance to support timely Cyber Resilience Act implementationComissão Europeia — DG CONNECT · EU-DIGITAL
  3. 033. Identify your assetsNCSC UK · EU-NCSCUK