Cyber Resilience Act: the reporting clock starts on 11 September
The Commission issued new guidance on 27 July and updated its operational page yesterday. Before the remaining 2027 duties apply, hardware and software manufacturers must already report actively exploited vulnerabilities and severe incidents within 24 and 72 hours.
- Jurisdiction
- European Union · Cyber Resilience Act
- Legal basis
- Regulation (EU) 2024/2847, Articles 14–17 and 69–71
- Verified
- 1 August 2026
- Review when
- Commission, ENISA or CSIRTs change the reporting format, platform or guidance

In brief
From 11 September 2026, Article 14 of the Cyber Resilience Act applies directly to manufacturers of in-scope products with digital elements — including products placed on the market before the Regulation’s general application. The duty is not triggered by every CVE: it requires a vulnerability contained in the product that is actively exploited, or a severe incident affecting product security. The urgent task is to build a reproducible decision path from signal intake and trigger confirmation to notification, correction and user communication.
- The early warning is due without undue delay and no later than 24 hours after the manufacturer becomes aware of a reportable event; the main notification has a 72-hour limit.
- Actively exploited vulnerabilities and severe incidents share the 24/72-hour start but have different final reports: 14 days after a corrective measure becomes available for the former, and one month after the 72-hour incident notification for the latter.
- Article 14 covers in-scope products already placed on the market before 11 December 2027; limiting the inventory to future launches is unsafe.
- Importers, distributors, support teams and customers should not assume they are the manufacturer, but they need a contractual and operational route that reaches the manufacturer without losing the clock.
The deadline that arrives before general application
The Cyber Resilience Act entered into force on 10 December 2024 and most of its obligations apply from 11 December 2027. Its calendar has an earlier operational milestone: Article 14 applies from 11 September 2026.
On 27 July, the Commission published its first practical guidance on the Regulation. The guidance is non-binding and does not replace the legal text, but it addresses scope, substantial modification, support periods, reporting and risk assessment. On 31 July, the Commission updated the manufacturer and reporting pages, confirming that the Single Reporting Platform is expected to be operational when the duty starts.
This does not bring every design, conformity and CE-marking requirement forward to September. It means that a specific capability — detect, decide, report and inform — starts earlier and must work against the product catalogue that already exists.
Confirmed calendar
Separating early reporting from general application prevents both delay and regulatory work being assigned to the wrong date.
- Regulation in force
The Cyber Resilience Act enters into force in the European Union.
- Assessment bodies
The chapter on notification of conformity assessment bodies starts applying.
- First guidance
The Commission issues non-binding practical guidance with 67 examples.
- Mandatory reporting
Article 14 starts applying to actively exploited vulnerabilities and severe incidents.
- General application
The remaining main CRA obligations start applying.
The clock belongs to the manufacturer — the whole chain must be able to trigger it
Article 14’s mandatory duty is addressed to the manufacturer: the person or entity that develops or has a product with digital elements developed and markets it under its name or trademark. A reseller, importer, integrator or customer does not automatically become the manufacturer by receiving an alert.
That distinction does not authorise passivity. An importer or distributor receiving a customer vulnerability report should know the manufacturer, product version and escalation channel. A manufacturer integrating third-party components still has to assess whether a vulnerability is contained and exploitable in its own product.
The decision belongs at product and economic-role level, not in a team label. One group may manufacture its own application, distribute a third-party device and use another service at the same time.
Minimum role matrix
| Role | Decisive question | Required output |
|---|---|---|
| Manufacturer | Is the product placed on the market under our name or trademark? | Article 14 owner, reporting endpoint and authority to inform users |
| Importer | Do we place a non-EU manufacturer’s product on the EU market? | Identified manufacturer, working contact and contractual escalation |
| Distributor | Do we make the product available without changing its properties? | Vulnerability route, catalogue and forwarding evidence |
| Integrator or customer | Do we use the product without placing it on the market under our name? | Support/manufacturer channel and internal risk response |
| Mixed group | What role do we hold for each SKU, version and territory? | Product-level memorandum, not a company-wide label |
Two triggers, not a CVE list
The first trigger is a vulnerability contained in the product with digital elements that the manufacturer knows is being actively exploited. A CVE, public proof of concept or high severity score alone does not establish active exploitation in the product concerned.
The second trigger is a severe incident affecting product security. The Regulation treats an incident as severe where it affects or can affect the product’s ability to protect the availability, authenticity, integrity or confidentiality of sensitive or important data or functions, or has led or can lead to malicious code being introduced or executed in the product or a user’s systems.
The decision record should retain the incoming signal, time, product and version, confirmed reach, exploitation analysis, severity assessment, decision-maker and missing facts. Without this, the deadline becomes an argument from memory during an incident.
24 hours, 72 hours and two different endings
For both triggers, the manufacturer submits an early warning without undue delay and within 24 hours of awareness, followed by a fuller notification within 72 hours. Content grows with the investigation; the first delivery does not require the completeness of the last.
For an actively exploited vulnerability, the final report is due no later than 14 days after a corrective or mitigating measure becomes available. For a severe incident, it is due within one month after the 72-hour notification. The CSIRT may also request an intermediate report.
A parallel track applies: the manufacturer must inform impacted users and, where appropriate, all users, including measures they can deploy. Indiscriminate public disclosure is not automatically synonymous with that duty; reach and detail should be proportionate to risk.
Two delivery tracks
T0 is the documented moment at which the manufacturer becomes aware of a reportable event.
- T0 + 24 HEarly warning
Event, product and known territories; for incidents, indicate suspected unlawful or malicious acts where applicable.
- T0 + 72 HMain notification
Nature, initial assessment and corrective or mitigating measures available to manufacturer and users.
- MEASURE + 14 DAYSVulnerability final
Description, severity, impact, actor when known and the security update or correction made available.
- 72 H + 1 MONTHIncident final
Detailed description, severity, impact, likely threat or cause and applied/ongoing mitigation.
- IN PARALLELUser information
Notice to impacted users and, where appropriate, all users, with usable and proportionate actions.
Older products also enter the reporting inventory
The transitional rule is material: Article 14 applies to every in-scope CRA product placed on the market before 11 December 2027. A search starting only with future launches omits the installed base most likely to produce the first real case.
The inventory should answer which versions were made available in which Member States, who still uses them, the support period, relevant components and how impacted users can be contacted. Notification asks for territories and user communication needs reach; neither dataset appears by magic in the first 24 hours.
Inventory inclusion does not settle legal scope. Excluded products or those covered by specific sectoral legislation need a documented decision. The goal is not to label everything in scope, but to prevent decisions without facts.
Fields that make the catalogue reportable
| Field | Question | Evidence |
|---|---|---|
| Identity | Which product, component, SKU and version? | Release, hash, SBOM or equivalent record |
| Role | Who places it on the market and under whose name? | Contract, trademark, entity and role memorandum |
| Territory | Where was it made available? | Distribution, customers, stores and channels |
| Support | What is the period and update route? | Published policy and version dates |
| Users | Who should receive mitigation? | Affected segment and tested channels |
| Dependencies | Which component connects the signal to the product? | Version, reach and exploitability analysis |
The Single Reporting Platform receives the report; it does not decide for the company
ENISA manages the Single Reporting Platform, which routes the notification to the coordinating CSIRT endpoint of the manufacturer’s main-establishment Member State and makes it simultaneously accessible to ENISA. The initial CSIRT disseminates it to CSIRTs in territories where the product was made available, subject to strict exceptions.
For the CRA, the main establishment is first the Member State where product-cybersecurity decisions are predominantly taken. If that cannot be determined, it is the establishment with the largest EU workforce. Manufacturers without an EU main establishment follow the Article 14 order covering authorised representative, importer, distributor and user location.
Before the first case, the company should validate access, deputies, out-of-hours contact and a minimum facts package. A credential held by one person or a platform known only to legal is not operational readiness.
A 72-hour exercise that produces evidence
Choose a material product already placed on the market and simulate a third-party-component vulnerability with credible exploitation indicators. The team does not receive every fact at the outset: it must confirm reach, identify territories, decide the trigger, prepare the warning and update the narrative.
The exercise passes only if each decision has an owner and timestamp, a deputy can execute the report, legal does not block on missing technical facts and support can segment users and distribute mitigation without exposing dangerous detail.
Retain the result as a file: scenario, timeline, participants, decisions, message versions, platform fields, gaps, actions and retest. A meeting without artefacts does not demonstrate capability.
Responsibility during the exercise
| Owner | Decision by 24 h | Output evidence |
|---|---|---|
| Product | Identity, version, role and territories | Frozen product sheet |
| Security | Exploitation, severity and technical reach | Signed timeline and analysis |
| Legal/compliance | Trigger, notifying entity and reservations | Short memorandum with assumptions |
| Incident lead | Authorise early warning and cadence | Decision log and submission copy |
| Support/comms | Segment users and mitigation | Approved message, list and delivery evidence |
| Management | Accept risk and remove blockers | Decision on gaps and resources |
Preparation plan to 11 September
The priority is not a long policy. It is making the chain from signal to product, decision, report, mitigation and user executable. Start with the highest-reach or highest-impact products, declare gaps and expand coverage in cycles.
This plan is a Velqory operational recommendation inferred from the Regulation and official implementation pages. It does not replace legal product classification, validation of the competent authority or technical instructions that ENISA and CSIRTs may issue.
Four deliveries, not four meetings
- 48 HOURSName and bound
CRA owner, deputy, economic roles, initial product list and open legal questions.
- DAY 7Connect the data
Versions, territories, users, components, support, contacts and vulnerability channels for priority products.
- DAY 14Close the playbook
Two triggers, criteria, escalation, 24/72/final, user communication, credentials and out-of-hours operation.
- DAY 21Run the exercise
Timed simulation with incomplete signal, changing facts, submission and communication.
- DAY 30Retest and decide
Fix gaps, retest deputies and take coverage, residual risk, budget and review date to management.
Sources consulted
Consulted on the stated update date.
Opens in a new window.- 01Regulation (EU) 2024/2847 — Cyber Resilience ActEUR-Lex · EU-EURLEX
- 02Commission guidance on the application of the Cyber Resilience ActEuropean Commission — Shaping Europe’s digital future · EU-DIGITAL
- 03Cyber Resilience Act — reporting obligationsEuropean Commission — Shaping Europe’s digital future · EU-DIGITAL
- 04Cyber Resilience Act — manufacturersEuropean Commission — Shaping Europe’s digital future · EU-DIGITAL
- 05Summary of the Cyber Resilience Act legal textEuropean Commission — Shaping Europe’s digital future · EU-DIGITAL
- 06Cyber Resilience Act implementation trackerEuropean Commission — Shaping Europe’s digital future · EU-DIGITAL
Participate
Share the analysis. Add context.
Distribute the article through your channel or leave an observation connected to the topic.

Comments
Loading the conversation.